Zao Ropeway or Chuo Ropeway? Start with the Destination
Comparisons

Zao Ropeway or Chuo Ropeway? Start with the Destination

Compare Zao and Chuo Ropeways by destination, fares, access and daily schedules.

The two systems serve different parts of the mountain. Zao Ropeway is the route to Jizo Summit and the winter juhyo area. Chuo Ropeway reaches Torikabuto and the Central Highlands, with Dokko Pond farther along the trail or seasonal lift route. Their fares do not buy interchangeable access.

Place you want to reachSystemAdult return fare currently listed
Jizo Summit, 1,661 mZao Ropeway, transfer at Juhyo Kogen¥4,400
Juhyo Kogen, 1,331 mZao Ropeway, lower section¥2,200
Torikabuto viewpointChuo Ropeway¥2,400
Dokko PondChuo Ropeway or Sky Cable, then walk; lift is seasonalCheck each segment

Jizo Summit: two cars and a transfer

From Zao Sanroku Station, the Sanroku Line takes about seven minutes to Juhyo Kogen. Change there for the Summit Line, which takes around ten minutes to Jizo Summit. The adult return ticket to the summit is ¥4,400; a return to the intermediate station is listed at ¥2,200.

The upper station places you beside the Jizo statue and the Jizo area. In winter, this is the regular sightseeing route for the snow monsters. Chuo Ropeway does not deliver ordinary sightseeing passengers to Jizo Summit; connecting across the ski area involves ski lifts and slopes, not a walking shortcut in street shoes.

Torikabuto and the Central Highlands

Chuo Ropeway climbs from Onsen Station to Torikabuto in about seven and a half minutes. The adult return fare is ¥2,400. From the upper station it is a short walk to the viewpoint; Dokko Pond lies farther into the Central Highlands and requires a walk or an operating lift.

Seasonal hours matter here. The operator lists Chuo Ropeway at 8:30 a.m.–5 p.m. through October 31 and 8:30 a.m.–4 p.m. from November 1 to December 16. Its regular winter periods have their own schedules. Check the current operation page and trail conditions before treating the published summer lift hours as available in November.

November 4–27: use the Sky Cable for the Central Highlands

Chuo Ropeway and the Central No. 1 Lift are scheduled for maintenance suspension from November 4 through 27, 2026. The operator says the Sky Cable will run during that interval for Central Highlands access. The change does not affect Zao Ropeway’s Jizo Summit route, which is a separate system.

Onsen Station, Chuo Ropeway’s lower terminal, is about a five-minute walk from the bus terminal. Zao Sanroku Station is roughly a 15-minute walk away. If you are travelling by bus, that difference affects how much time you have before boarding; check the return timetable before adding a bath or another viewpoint.

Choose the Jizo route for the summit statue or snow monsters. Choose Chuo or Sky Cable for Torikabuto and Central Highlands walks. Compare November cableway options and the weather backup plan if wind, cloud or maintenance changes your choice. For connected plans, see ropeway priority booking, November snow and footwear, Zao’s winter juhyo timing, autumn route comparison, Zao day-use bathing, Zao public baths, and winter Zao stays without skiing.

Sources - Zao Ropeway: [route, fares and hours](https://www.zaoropeway.co.jp/winter/guide.php), [current operation](https://www.zaoropeway.co.jp/winter/index.php), and [access](https://zaoropeway.co.jp/winter/access.php). - Zao Kanko Kaihatsu: [Chuo Ropeway and Sky Cable schedules](https://zaochuoropeway.co.jp/jp/winter/guide.php), [fares](https://zaochuoropeway.co.jp/jp/summer/payment.php), [station access](https://zaochuoropeway.co.jp/jp/summer/access.php), [Dokko Pond route](https://zaochuoropeway.co.jp/jp/summer/dokko.php), and [November 4–27 maintenance notice](https://zaochuoropeway.co.jp/jp/summer/info.php?p=3925). - Yamagata Tourism: [Zao Ropeway](https://yamagatakanko.com/attractions/detail_7455.html), [Chuo Ropeway](https://yamagatakanko.com/attractions/detail_6702.html), and [Dokko Pond](https://yamagatakanko.com/attractions/detail_12296.html). Checked October 29, 2026. Published schedules and access depend on season and operating conditions.